Rail Car Loading Demo Movies

rlConventional Rail Car Loading
Scale stops between rail cars potentially wasting 90 minutes on a unit train

slSmartLoad
GMS automatically runs one draft of the next car and waits for the operator.
This can save up to 20 seconds per rail car or 36 minutes per unit train

sslSuper SmartLoad
GMS automatically runs two drafts of the next car and waits for the operator.
This can save up to 50 seconds per rail car or 90 minutes per unit train

ssl_ntMissing Tag Demo
This movie shows how Compuweigh’s SmartRead RF ID system handles a car with a missing rail tag